9 solutionsAI and software for oil and gas →

AI that knows your wells.
Live data from your rigs.

Petroleum Chatbot answers from your drilling reports and plans, in English, Arabic or Urdu, and makes the files the work needs. Live Rig tracks stores, equipment and every joint of pipe, and shows each rig live.

chatpetroleum.space/chatLive

ڈی ڈی آر 41 سے 43 کی سمری بنا دیں۔ کوئی مسئلہ ہے؟

Summarise DDR 41 to 43. Anything I should worry about?

Three days, 9,840 → 10,610 ft. Two things to watch:

  • Partial losses twice (18 and 25 bbl/h) near 10,200 ft
  • Overpull rising on connections: hole cleaning, check ECD
DDR-41 p.2DDR-42 p.2DDR-43 p.3
XLSX12¼ section summary.xlsx· formulas kept
Ask in English, عربي or اردو…↑
Sources · Well A-12 · 12¼" section
  • DDR-41.pdf

    p.2 · mud and losses

  • DDR-42.pdf

    p.2 · losses 18 bbl/h

  • DDR-43.pdf

    p.3 · overpull 25 klb

  • Mud program.pdf

    p.14 · ECD limits

9

Solutions, from the chatbot to RFID

3

Languages: English, Arabic, Urdu

Read-only

To your operational systems

90 days

Pilot, with targets agreed first

How it works

One AI layer over everything your operation already produces

Your systems stay as they are. ChatPetroleum reads from them, joins them with tag reads and rig data, and gives your people screens, alerts, files and answers.

ChatPetroleum · AI layerRead-only to operations

Petroleum Chatbot

Ask · read · write files

Live Rig

Tags · string · rig data

Models

Language · time series · physics

Agents

One per discipline

One set of numbers

Your rates, in every answer

Approvals

AI drafts, a person signs

Evaluations

Tested on your past wells

Model routing · Project memory · Retrieval with sources · Permissions · Identity · Human sign-off · Audit trail

SAP / SAP PMOdooPI historianSCADA / DCSWITSMLMaximoDocumentsRFID readersTelemetry
02 · Systems of record
01 · Where the data comes from

Rig floor

Rig 07 · WITSML · every second

Tag read

GEN-0102 · iPhone · NFC

Daily report

DDR-43.pdf · 6 pages

Base store

1,240 items · 3 sites

In transit

Truck T-14 · 22 joints

Field engineer

Asking in Urdu, by voice

Connections to operational systems are read-only. Nothing writes to the control or safety layer.

What we offer

9 solutions for oil and gas

All solutions

Who it is for

Built for the people who run the operation

Operators, drilling contractors and oilfield service companies use the same platform, each team for its own work.

OperatorsDrilling contractorsOilfield service companiesMidstreamRefining
  1. Drilling engineers and superintendents

    Morning summaries from every daily report, offset well reviews, and live rig screens with plain-language alerts.

    Drilling report automation →Live rig monitoring →

  2. Rig and workshop managers

    Overhaul plans costed from your own rates, and equipment service and certificate status on a scan.

    Overhaul and maintenance planning →RFID asset and inventory tracking →

  3. Production engineers

    Well files and production reports answerable in seconds; well reviews and workover proposals drafted.

    Petroleum Chatbot →Document search and tenders →

  4. Materials and supply chain

    Stock and value per store, rig and truck, chemicals by lot and expiry, and moves posted to SAP or Odoo.

    RFID asset and inventory tracking →

  5. HSE and QA/QC

    Procedures answered in Arabic, Urdu or English, and lifting gear certificates tracked before they expire.

    Document search and tenders →RFID asset and inventory tracking →

  6. Management and IT

    A staged rollout with measured results, read-only integration and hosting in your region.

    AI implementation and integration →Drill string tracking →

Petroleum Chatbot

ChatGPT does not know your wells. Petroleum Chatbot reads your files.

A general chatbot knows the textbook. Petroleum Chatbot works from your own reports and plans, keeps one set of numbers, and speaks the way your engineers speak.

Ask Petroleum Chatbot a question
What you needChatGPT or ClaudePetroleum Chatbot
Has read your reports and plansOnly what you paste into one chat✓ Every file in the project, every chat
Shows where an answer came fromNo✓ File and page under each answer
Same total every time you askNo✓ One set of numbers per project
Remembers the project next weekNo✓ Facts kept per project
Makes working filesText to copy out✓ Excel with formulas, Word, PowerPoint
Speaks Urdu and Arabic on sitePartly✓ Typed or spoken, mixed with English

01 · The morning report

The reports arrive at six. The summary is ready at six.

Every drilling office does this by hand: open each rig's report, find the numbers, type them into a template before the meeting. Petroleum Chatbot reads the reports, fills the summary and shows the page behind every value. Here is the same morning, twice.

Morning drilling summary · the same morning, twiceSample data · illustrative timings
Today3 rigs · reports by email

01 · The reports arrive

05:30 → 06:00

Three rigs email their daily reports as PDFs. Someone has to read all of them before the morning meeting.

02 · Writing the summary

06:00 → 08:10

The engineer opens each PDF, finds depth, mud, losses and NPT, and types them into the template, rig by rig.

Morning report · rig 2 of 37 / 12 fields
Rig
Well
Depth
Progress
Mud weight
Viscosity
Losses
NPT
NPT cause
Problems
Next 24 h
Remarks

Searching… DDR-42.pdf p.4? p.5? losses table…

08:30

Summary ready

2 h+

Of copying

Later

Questions answered
With Petroleum Chatbot06:04
Engineer

رگ 07 کی ڈی ڈی آر سمری بنا دیں، کوئی مسئلہ ہے؟

Make the Rig 07 DDR summary. Any problems?

Petroleum Chatbot
Three days, 9,840 → 10,610 ft. Two things to watch: partial losses twice near 10,200 ft, and overpull rising on connections. Summary ready for the morning meeting.
Morning summary · Rig 078 / 8 filled
Rig

Rig 07 · Well A-12

from DDR-43 · header

Depth

10,610 ft

from DDR-43 · p.1

Progress

770 ft in 3 days

from DDR-41 to 43

Mud weight

11.4 ppg

from DDR-43 · p.2

Losses

18 and 25 bbl/h near 10,200 ft

from DDR-42 p.2 · DDR-43 p.2

NPT

1.5 h · rig repair

from DDR-43 · p.3

Watch next 24 h

Hole cleaning and ECD while reaming

set by program · p.14

Status

Watch

set by your rules

✓ Every value traced to a report page · ready 06:04

06:04

Summary ready

0

Of copying

Now

Ask anything after

On real work

Six jobs Petroleum Chatbot does for oil and gas teams

01 · Drilling

Summarise daily drilling reports and catch problems early.

ChatPetroleum reads each day's report, tracks mud weight, losses and hole condition across the well, and compares them with offset wells. It tells the team what changed and what to watch next.

  • DDR 41 → 43: mud weight held, returns checked hourly
  • Losses reported twice in the 12¼" section
  • → Watch next 24 h: hole cleaning and ECD while reaming

02 · Rig overhaul

Plan a rig overhaul with one budget and one schedule.

Scope, inspection, repair and testing for every item on the rig, with cost, manpower and dates. The workbook, the plan and the presentation all use the same numbers. Tell it about a delay in chat and the tracker updates.

  • Drawworks: critical path, weeks 1–10
  • Hook proof-load test to 1.5 × SWL (API RP 8B)
  • → "2 days lost, drum bearing" → dates move, reason logged

03 · Maintenance

Find equipment that is about to fail, and what fixed it last time.

It reads vibration, temperature and pressure trends next to the equipment's maintenance history, finds the past failure that looks the same, and says what was done then.

  • Mud pump 2: vibration rising for 3 days
  • Looks like the fluid-end failure in 2025
  • → Suggested: inspect valves and seats at next connection

04 · Production

Explain why a well's rate dropped.

Rates, pressures and well tests read together. When a well drifts, it gives the likely cause in a production engineer's terms and suggests the test that would confirm it.

  • Well W-7: rate down 12% in 10 days
  • Water cut stable; wellhead pressure falling
  • → Suggested: scale check before stimulation

05 · Documents

Search all your engineering documents with one question.

Programs, end-of-well reports, procedures, P&IDs and change records, searched across projects. Every answer shows the file and page.

  • "Which wells lost circulation in this formation?"
  • Answer from 6 end-of-well reports, each cited
  • → Table of depths, mud weights and what fixed it

06 · HSE and permits

Prepare permits by voice. A person signs them.

The supervisor says what the job is, in English, Arabic or Urdu. ChatPetroleum drafts the permit, checks it against the procedure and flags anything missing.

  • Hot work, PTW-2291: gas test due every 2 h
  • Last test 4 h ago → flagged before issue
  • → Supervisor signs; nothing is issued automatically

02 · On the rig

A question in Urdu. An answer before the next trip.

One exchange with the lid off: who is asking, what the joints on the rig floor have done, what the reports say about the trip, and the work order drafted for a person to approve.

Live · Rig 07 · Well X-12 · Urdu and English

Sample data
Transcript
Superintendent

رگ 07 پر اس ہفتے کون سے جوائنٹس انسپیکشن کے لیے ڈیو ہیں؟ اگلی ٹرِپ سے پہلے بتا دیں۔

Which joints on Rig 07 are due for inspection this week? Tell me before the next trip.

  • get_string() → Live Rig
  • rotating_hours() → Live Rig
  • read_reports() → Documents
Petroleum Chatbot

تین جوائنٹس: DP-01247 (16 گھنٹے باقی)، DP-01231 اور DP-01266۔ ٹرِپ آؤٹ دو بجے ہے، انہیں ریک پر رکھ دیں۔

Three joints: DP-01247 (16 h left), DP-01231 and DP-01266. The trip out is at 14:00; lay them down on the rack.

Superintendent

ٹھیک ہے، ان کا ورک آرڈر بنا دیں۔

Fine, raise the work order for them.

  • draft_work_order() → SAP PM · waits for approval
Petroleum Chatbot

ورک آرڈر کا ڈرافٹ تیار ہے۔ رگ مینیجر کی منظوری کے بعد جاری ہوگا۔

The work order is drafted. It is issued once the rig manager approves it.

Identity

✓ Signed in✓ Member · Rig 07 project

Answers come only from what this person may see. Nothing is written to a company system until a named person approves it.

Tool calls

get_string

Live Rig · rig floor reader · 210 ms

{ "rig": "RIG-07" }

{ "in_hole": 341, "reads_today": 412 }

rotating_hours

Live Rig · per serial · 180 ms

{ "limit_h": 1200, "within_h": 120 }

{ "due": ["DP-01247", "DP-01231", "DP-01266"] }

read_reports

Documents · DDR-41 to 43 · 640 ms

{ "ask": "next trip out" }

{ "trip_out": "planned 14:00", "source": "DDR-43 p.3" }

draft_work_order

SAP PM · read-only until approved · 330 ms

{ "equipment": ["DP-01247", "DP-01231", "DP-01266"], "task": "inspection" }

{ "status": "awaiting approval", "approver": "Rig manager" }

Why ChatPetroleum

One platform where others give you one piece

General AI tools do not know your wells. Drilling software does not know your stores. ChatPetroleum puts your reports, your assets and your rigs in one place, in the languages your people speak.

What you needGeneral AI toolsSingle-purpose drilling softwareChatPetroleum
Answers from your own reports, with the file and pageNoRarely✓ Yes
RFID tracking of stores, equipment and drill pipeNoRarely✓ Yes
Live rig data and alertsNoYes✓ Yes, as a pilot
Linked to SAP or OdooNoSometimes✓ Yes, read-only
Arabic and Urdu, typed or spokenPartlyRarely✓ Yes
Hosting in your region or your own environmentVariesVaries✓ Yes
Useful in the first week, on files aloneYesNo, needs integration first✓ Yes

Categories, not named products. What any one product offers varies; ask us to compare against the one you use.

How a pilot runs

Ninety days on one store or one rig, then a decision

Every Live Rig engagement starts small, with targets agreed before we begin. You decide on the rest of the fleet from measured results.

Ask about a pilot

01 · Weeks 1–2

Survey

Visit the store, yard or rig. Agree which assets to tag, where readers go and what we measure.

You get: A written scope and targets

02 · Weeks 3–5

Tag and install

Tag the pilot assets, fit readers at gates, stores or the rig floor, and connect your ERP and rig data, read-only.

You get: A working system on your site

03 · Weeks 6–11

Run live

Your people work as normal. Screens, alerts and reports run next to your current process.

You get: Six weeks of measured use

04 · Weeks 12–13

Review

Results against the targets in one report, and a costed plan for the rest of the fleet.

You get: A decision on facts, not a demo

What we measure together

  • Share of tags read correctly at each read point
  • Stock accuracy in the pilot store
  • Hours saved on daily reports
  • Inspections and certificates flagged on time

What we need from you

  • One store or one rig, and a named contact
  • Read-only access to your ERP and rig data
  • Site access for installation
  • Targets agreed before we start

Where it helps

From the well to the refinery

01

Upstream

Exploration, drilling, completions and production

  • Real-time drilling advisory and daily drilling report summaries
  • Well comparisons, offset analysis and end-of-well reports
  • Completion and intervention pre-job checks
  • Production and artificial-lift diagnostics
  • Subsurface and well files answerable in one question

02

Midstream

Pipelines, compression, storage and terminals

  • Compressor and pump health against the operating envelope
  • Pressure and flow deviations traced to segment and cause
  • Integrity and inspection reports tied to the asset register
  • Permit-to-work checks against the current revision
  • Shift handovers written from the alarm log

03

Downstream

Refining, processing and petrochemicals

  • Bad-actor lists from alarms and maintenance failure codes
  • Exchanger fouling and furnace efficiency against design
  • Turnaround scope from work orders, inspections and deferrals
  • Procedures and MOC records searchable with citations
  • Incident reports classified and linked to past events

04

Services and support

Contractors, workshops, procurement and management

  • Overhaul plans, cost sheets and trackers
  • Tender terms of reference and compliance matrices
  • Investor and management presentations
  • Market questions answered from the web with sources
  • Training: well control, Excel, finance for non-finance staff

Trust

Your operation and data stay protected

Most teams start with files. Company systems are connected read-only when a project needs them.

Daily reports and spreadsheetsEngineering documentsSAP / SAP PMHistorians (PI)SCADA / DCSMaximo / CMMSWITSMLOSDU
  1. 1

    It cannot change your control systems

    It reads SCADA, DCS and historian data. It never writes a setpoint or touches a safety system.

  2. 2

    People make the decisions

    Every suggestion shows its evidence. Nothing is raised, closed or scheduled in a company system until a named engineer signs it off.

  3. 3

    Your data stays where you choose

    Hosted with storage in your region, or set up inside your own environment if your policy requires it.

  4. 4

    Users see only what they already can

    Each person sees what their access in the source systems allows, and nothing more.

  5. 5

    Tested on your own history first

    Before going live, it is checked against your past events: known failures, false alarms and questions with known answers.

  6. 6

    Everything is logged

    Each question, answer, source and sign-off is recorded with who did it and when.

Get started

Three ways to start

01 · Free · today

Try the Petroleum Chatbot

Ask a few questions without an account. Create a free account to keep projects, upload your reports and make Excel, Word and PowerPoint files.

02 · 90 days · one store or rig

Run a Live Rig pilot

Survey, tagging and installation, six weeks live next to your current process, and a review against targets agreed before we start.

03 · Staged · company-wide

Roll AI out across the company

A first use case with a baseline, read-only links to SAP, Odoo, PI and SCADA, hosting in your region, and governance your IT team can sign off.

Resources

Guides, tools and the latest articles

All articles

Questions

Common questions

What does AI implementation in the petroleum sector involve?+

Choosing one piece of work, giving AI the data and documents for it, measuring the result against today, and widening from there. Most companies start with reports and documents, then connect operational systems.

Can AI change a setpoint or write to our control system?+

No. It reads from SCADA, DCS and historians and never writes to the control or safety layer. Actions are drafted in business systems and wait for an engineer to approve them.

Do we need a data lake first?+

No. Daily reports, programs, plans and spreadsheets are enough to start, which is what ChatPetroleum does today.

Which languages does it support?+

English, Arabic and Urdu, typed or spoken, including mixed Urdu or Arabic and English.

Where is our data kept?+

In ChatPetroleum, files stay private to the account that owns the project. For enterprise deployments, data stays where your policies say it must.

What does a first project look like?+

One team, one project and real files in ChatPetroleum, measured over 30 to 90 days; then one asset or workflow connected read-only and evaluated against past events.

What is ChatPetroleum?+

An AI assistant and chatbot built for the petroleum industry: projects that remember, your own files with citations, deep oil and gas knowledge, voice in English, Arabic and Urdu, and Excel, Word and PowerPoint outputs.

Who is it for?+

Drilling, completions, production and maintenance engineers, rig and workshop managers, oilfield service companies and the managers who report on their work.

Can I try it without an account?+

Yes. Ask a few questions at chatpetroleum.space/chat; create a free account to keep chats, start projects and make files.

Talk to us

Start with Petroleum Chatbot or a Live Rig pilot

Tell us the work you want to improve and the data you have. We will come back with the right solution to start with, what it needs and how to measure it.

  • The first solution and how to measure it
  • Which systems, if any, it needs
  • Where your data would be stored
Or try Petroleum Chatbot now

Have a drilling, production or maintenance question? Ask Petroleum Chatbot. It answers straight away.

Ask a question

This form is for companies planning an AI project with our team.

We reply by email. No mailing list.