Blog · 24 November 2026 · 9 min read
ChatGPT prompts for petroleum engineers: 25 prompts for drilling, production and maintenance, with what to check
The best ChatGPT prompts for petroleum engineers give the model the well data, the units and the method, and ask it to show its working, so that you can check the answer in a minute. Below are 25 prompts for drilling, production, maintenance and everyday office work. Each comes with the one thing to check before you use the result. They work in ChatGPT, Claude, Gemini or ChatPetroleum.
Why most prompt lists fail engineers
Search for petroleum engineering prompts and you mostly find lists like "Explain reservoir simulation" or "Suggest ways to improve drilling efficiency". They produce textbook paragraphs. They do not give the model your numbers, so it fills the gaps with plausible guesses. They also never say how to tell a good answer from a confident wrong one.
That last point matters. In PetroBench, a 2026 benchmark of 1,200 petroleum engineering questions across drilling, production and reservoir engineering, the best of eight leading models scored 65.3% on multiple-choice questions and 74.3% on true-or-false. The authors found models did better on open questions than on precise factual ones, best in production engineering and worst in reservoir engineering. In plain terms, even the best model tested got roughly one in three or four precise questions wrong when answering from memory. A good prompt cuts that down by giving the model the facts and making the answer checkable. It does not remove the need to check.
A prompt template that works for engineering questions
The vendors' own guides agree on the basics. Anthropic's prompting guide suggests showing your prompt to a colleague with little context: if they would be confused, the model will be too. It recommends putting long documents at the top, above the question, and asking the model to quote the relevant parts before it answers. OpenAI's guide recommends giving the model the data it was not trained on, a few input and output examples, and clear sections. For engineering work that becomes six parts.
| Part | What to write | Example |
|---|---|---|
| Role and context | Who you are and the situation | "I am a drilling engineer on a vertical land well in the Potwar basin." |
| Data | The numbers, with units, or the pasted report | "TVD 10,000 ft, mud weight 10.0 ppg, SIDPP 500 psi." |
| Task | One clear job | "Calculate the kill mud weight." |
| Method | The formula or standard you expect | "Use the oilfield formula with 0.052." |
| Output | Format and units | "Show each step, round to 0.1 ppg, then a one-line summary." |
| Honesty rule | What to do when data is missing | "If any input is missing, ask me. Do not assume a value." |
The honesty rule is the one people skip and the one that matters most. Without it, a model that is missing the shoe depth will invent one and carry on.
Check one: a calculation you already know
Before trusting a tool with your own well, give it a problem whose answer you know. For the example above, kill mud weight = 10.0 + 500 ÷ (0.052 × 10,000) = 10.0 + 0.96 = 11.0 ppg. If the tool gets the formula, the constant or the rounding wrong here, it will get them wrong on your well too.
Drilling prompts (1 to 8)
| # | Prompt | What to check |
|---|---|---|
| 1 | "Here is today's daily drilling report [paste]. Summarise it for the morning call in eight lines: depth start and end, footage, operations by time, mud weight and losses, NPT with cause and hours, and what to watch in the next 24 hours. Quote the report line for every number." | Every figure has a quoted line; hours add up to 24 |
| 2 | "Kill sheet check: TVD [ ] ft, MD [ ] ft, original mud weight [ ] ppg, SIDPP [ ] psi, SICP [ ] psi, pit gain [ ] bbl. Calculate kill mud weight, initial and final circulating pressure using slow circulating rate pressure [ ] psi. Show each formula before using it." | FCP uses the ratio of kill to original mud weight; units consistent |
| 3 | "Calculate ECD at the shoe: mud weight [ ] ppg, annular pressure loss to the shoe [ ] psi, shoe TVD [ ] ft. Then compare it with a leak-off test equivalent of [ ] ppg and state the margin." | ECD = MW + APL ÷ (0.052 × TVD); TVD, not MD |
| 4 | "Calculate MAASP from LOT equivalent mud weight [ ] ppg, current mud weight [ ] ppg and shoe TVD [ ] ft. Explain in two lines why MAASP changes when the mud weight changes." | (LOT EMW − MW) × 0.052 × shoe TVD |
| 5 | "Annular velocity for [ ] gpm in a [ ] in hole with [ ] in drill pipe. Then say whether it is likely to clean a vertical hole with [ ] ppg mud, and what else I should look at." | 24.5 × Q ÷ (Dh² − Dp²) in ft/min; it should name rheology and cuttings, not only velocity |
| 6 | "From these ten DDRs [paste], make a table of every NPT event: date, depth, duration, category (rig equipment, downhole, waiting, weather, other), and the report wording. Do not merge events." | Spot-check three events against the reports |
| 7 | "Buoyed weight of [ ] ft of [ ] in, [ ] lb/ft drill pipe in [ ] ppg mud. Show the buoyancy factor." | BF = 1 − MW ÷ 65.5 for steel |
| 8 | "Draft a pre-spud meeting agenda for a [type] well: hazards from the offset summary below [paste], responsibilities, well control drills and stop-work authority. Mark anything that must come from our own procedures as [CHECK PROCEDURE]." | Placeholders, not invented procedure numbers |
For a live well, any figure from prompts 2 to 4 is a cross-check of the kill sheet, not a replacement. The approved program and the responsible engineer decide. Our article on AI for daily drilling reports goes further on prompt 1.
Production prompts (9 to 14)
| # | Prompt | What to check |
|---|---|---|
| 9 | "Here are monthly rates for well [ ] [paste table]. Fit an Arps decline (exponential, hyperbolic and harmonic), give qi, Di and b for each, and say which fits best and why. Write the Python code so I can rerun it." | b between 0 and 1 unless you have a reason; run the code yourself |
| 10 | "Productivity index from a test: rate [ ] bbl/d, reservoir pressure [ ] psi, flowing bottom-hole pressure [ ] psi. Then build a Vogel IPR table at five flowing pressures." | J = q ÷ (Pr − Pwf); Vogel only below bubble point |
| 11 | "Well [ ] rate fell [ ]% in [ ] days. Water cut [ ], GOR [ ], wellhead pressure [ ], choke [ ]. List the likely causes in order, the data that points to each, and the cheapest test that would confirm it." | Causes tied to the data you gave, not a generic list |
| 12 | "Rewrite this well test procedure [paste] as a one-page checklist for the operator, keeping every hold point and value exactly as written." | Compare values line by line with the original |
| 13 | "Explain to a new graduate how a gas lift unloading valve opens and closes, with a simple pressure-depth sketch described in words." | Teaching use only; compare with a textbook |
| 14 | "Turn this month's production figures [paste] into a short report for management: total, change from last month, top three gains and losses by well, and one line on each cause from the notes." | Totals recalculated by you in Excel |
Maintenance and reliability prompts (15 to 20)
| # | Prompt | What to check |
|---|---|---|
| 15 | "From this work order history [paste export], list the ten assets with the most corrective work orders in 12 months, the most common failure description for each and total downtime." | Counts match a pivot table of the same export |
| 16 | "Write a job plan for replacing valves and seats on a triplex mud pump fluid end: steps, isolation points, tools, spares and estimated hours. Mark every torque value as [OEM MANUAL]." | No invented torque or clearance figures |
| 17 | "Here is vibration and temperature data for pump [ ] over 30 days [paste]. Describe the trend, what failure modes it is consistent with, and what to inspect first." | It should say what it cannot tell from the data |
| 18 | "Draft a rig overhaul scope for [equipment list], with phases (dismantle, NDT, repair, reassembly, testing) and the inspection category per API RP 8B where it applies. Leave all costs blank." | Costs blank until your rates go in |
| 19 | "Turn these inspection findings [paste] into a punch list sorted by risk: item, finding, action, owner, due date." | Nothing dropped; count items in and out |
| 20 | "Compare these two OEM maintenance intervals [paste] with our current schedule [paste] and list every difference." | Each difference cites both documents |
Prompts 15 to 20 work better on a tool that keeps the asset list and history in one place. See maintenance planning for how that looks.
Office and project prompts (21 to 25)
| # | Prompt | What to check |
|---|---|---|
| 21 | "Read this tender scope [paste] and build a compliance matrix: clause number, requirement, our response, evidence needed, owner." | Every clause present; clause numbers exact |
| 22 | "Build an Excel cost sheet for [scope] with an inputs sheet (rates, quantities, currency [ ]) and a calculation sheet using formulas only. Explain each formula." | Change one rate; totals must move |
| 23 | "Write an email to the contractor about [issue], firm but polite, under 150 words, asking for a reply by [date]." | Tone and facts; nothing promised that you did not say |
| 24 | "Make a 10-slide outline for a management update on [project] from these figures [paste]. Use only these numbers." | Every number on a slide is in your data |
| 25 | "Quiz me with ten questions on [topic, for example the wait-and-weight method], one at a time, and explain my mistakes." | Good for revision; confirm doubtful points in the course manual |
What not to paste into a public chatbot
Many prompts above ask you to paste reports. Before you do, check your company policy. Consumer accounts may keep chats, and some settings allow them to be used for training. As a rule:
- Never paste partner data, unreleased well results, contract prices or personal data into a tool IT has not approved.
- Replace well names and coordinates with codes if you must use a public tool for a calculation.
- Use an approved company tool, or one that keeps files private to your project, for real reports.
- Keep a copy of the prompt and answer for anything that goes into a decision.
We cover this in more depth in keeping oil and gas data private with AI.
Five checks for any AI answer
- Units: every number has a unit, and TVD and MD are not mixed.
- Formula: the model wrote the formula before using it, and it is the one you would use.
- Source: figures from your data are quoted or cited; figures from general knowledge are marked as such.
- Repeat: ask again in a new chat. If the number changes, neither answer is trustworthy yet.
- Sense: compare with a value you know from offset wells or experience. A kill mud weight 3 ppg above the current one deserves a second look.
An SPE Journal of Petroleum Technology article from 2023 put the core risk plainly: overreliance on AI without proper checks and balances can lead to disastrous outcomes. Models have improved since then, but the advice has not changed.
How to start using these prompts this week
- Pick three prompts that match work you do every week.
- Run each on a finished job where you know the right answer. Note what was wrong.
- Add the missing detail to your prompt: units, method, the honesty rule. Run it again.
- Save the prompts that pass in a shared document for your team, each with its check.
- Use them on live work for two weeks and time the task before and after.
- Move the ones that need your own files to a tool that keeps a project's files and figures together.
If you want the wider picture of which tools suit which task, read best AI tools for petroleum engineers.
ChatPetroleum runs these prompts on your own project files: it remembers the well or overhaul facts, cites the file and page for every number, shows the formula before the answer and builds Excel sheets with live formulas. Try any of the 25 prompts free at /chat, no account needed for your first questions.
Questions people ask
What are good ChatGPT prompts for petroleum engineers?
Prompts that give the model your data with units, name the task and the method, ask for the formula and working, and tell it to ask when data is missing. For example: "TVD 10,000 ft, mud weight 10.0 ppg, SIDPP 500 psi. Calculate kill mud weight, show each step, ask if anything is missing."
Can ChatGPT do petroleum engineering calculations?
It can do standard calculations such as hydrostatic pressure, kill mud weight, ECD and decline curve fits, but it can pick the wrong formula or constant. Ask it to write the formula first, check one known answer, and confirm any live-well figure against the approved program.
How accurate is AI on petroleum engineering questions?
In the 2026 PetroBench benchmark of 1,200 petroleum engineering questions, the best of eight leading models scored 65.3% on multiple choice and 74.3% on true-or-false. Answers grounded in your own data and checked against formulas are far more reliable than answers from memory.
Is it safe to paste daily drilling reports into ChatGPT?
Only if your company has approved the tool for that data. Consumer accounts may keep chats. Use an approved company tool or one that keeps files private to your project, and remove well names and partner data if in doubt.
Do these prompts work in Claude, Gemini and Copilot?
Yes. The structure (role, data, task, method, output, honesty rule) works in any current assistant. The answers will differ, so run the same check on each tool before you rely on it.