Planning a rig overhaul with AI: scope, cost, manpower and timeline in one sitting

A rig overhaul plan is a large spreadsheet built under time pressure: dozens of equipment items, each with a scope, parts, workshop hours, inspection and a cost, then a manpower plan and a timeline that has to fit the gap between contracts. It usually takes an experienced engineer days. With the right setup, AI produces a first complete version in an afternoon and keeps it consistent as the scope changes.

What goes into an overhaul plan

PartContents
Equipment scopeDrawworks, top drive, mud pumps, rotary, BOP and control system, generators, mast and substructure, handling tools
Work per itemInspection category, repair or replace, parts, workshop hours, third-party services
CostParts, labour, inspection, transport, contingency, per item and in total
ManpowerTrades and headcount by week, own staff and contractors
TimelineSequence, dependencies, critical path, bays and cranes available
Exclusions and assumptionsWhat is not included, currency, rates, lead times

Where AI helps most

Turning the equipment list into a scope

Given the rig's equipment list, its condition reports and the last overhaul, AI drafts the scope per item, with typical work for the inspection level chosen. The engineer edits rather than writes.

Costing from your own rates

This is where general chatbots fail: they invent rates. A planning assistant must take your workshop rates, labour rates, parts prices and inspection costs from your files and apply them consistently. Where a rate is missing, it should say so and mark the figure as an estimate.

Building the manpower plan and timeline

From the work hours per item and the trades needed, AI builds the manpower plan by week, and a timeline that respects dependencies (the mast inspection before the drawworks goes back, for example) and the number of bays available. It shows which items are on the critical path and why.

Answering what-if questions

"What if we defer the generator overhaul?" "What if the top drive parts take six weeks?" Changes ripple through cost, manpower and timeline consistently, because there is one set of numbers for the project.

Producing the deliverables

An Excel workbook with formulas, a Word plan with a sign-off table, and a presentation for management, all from the same figures.

The rule that makes it trustworthy: one set of numbers

Every total must come from the project's own figures, and stay the same until someone changes an input. If the same question in a new chat gives a different total, the tool is not fit for planning. Test this before relying on any assistant. We explain why in the chatbot for the petroleum industry.

Inputs to prepare

  • Equipment list with makes, models and serial numbers
  • Condition and inspection reports, and the last overhaul report
  • Your rate card: workshop, labour by trade, inspection, transport
  • Parts price lists or recent purchase orders
  • Workshop constraints: bays, cranes, working hours
  • Target dates and the contract window
  • Exclusions: what this overhaul does not cover

A workflow that works

  1. Create a project for the overhaul and upload the inputs.
  2. State the project facts once: currency, exclusions, dates, constraints.
  3. Ask for the scope per equipment item; review and correct it.
  4. Ask for the cost sheet from your rates; check items where a rate was missing.
  5. Ask for the manpower plan and timeline; review the critical path.
  6. Generate the workbook, plan and presentation.
  7. As the scope changes, ask for updates; check totals still trace to inputs.

What stays with the engineer

  • Deciding the inspection level and repair or replace for each item
  • Judging condition from what is seen on the equipment
  • Approving rates and accepting estimates
  • Signing the plan

Linking the plan to the assets

An overhaul plan is more accurate when it knows which serial number is installed where, its hours and its history. Equipment tracked with RFID brings that into the plan directly.

ChatPetroleum plans overhauls from your own rates, keeps one set of numbers per project and makes the Excel, Word and PowerPoint files. Try it on your next overhaul.

Questions people ask

Can AI plan a drilling rig overhaul?

It can draft the scope, cost sheet, manpower plan and timeline from your equipment list, reports and rates, for the engineer to review and approve.

How do we stop AI inventing costs?

Give it your rate card and price lists, require every figure to cite its source, and have it mark anything without a source as an estimate.

What files are needed to plan an overhaul with AI?

The equipment list, condition and inspection reports, the last overhaul report, your rate card, parts prices, workshop constraints and target dates.

Try Petroleum Chatbot on your own work

Ask a drilling, production or maintenance question now, free. Create an account to keep projects, add your reports and make Excel, Word and PowerPoint files.